STS Marine Solutions

Honninsvag & Murmansk STS Transhipment Terminal

STS Transhipment Offshore Mega Terminals strategically located to ensure that Arctic-classed LNG tankers transporting cargo through the Barents Sea can transfer their cargo to conventional tankers and return to thier operating area.

From Pre to Post Project at both locations, LNGSTS carried out the Pre and Project Consultancy, Terminal Management and STS Operations, including the following to ensure the operations were carried out as required:

Project Consultancy
STS Equipment Management
Optimoor and Compatibility Studies
Documentation Production
Supply of Mooring Masters

Supply of LNG Superintendant
Supply of Assistants
Operational Management
Operational Coordination
Training and Simulator Coordination

LNGSTS carried out 130 STS operations at Honninsvag and 10 operations at Murmansk with further seasons planned.